Microcement Dubai tower bathrooms can often be finished straight over the existing tiles, as long as those tiles are sound, firmly bonded and properly keyed. Zavoré installs it with our own artisans in apartments across Dubai and every emirate, lifting any hollow tiles, filling and reinforcing the grout lines, and keeping the tanking behind the shower intact before the first thin coat goes on.
How a job is prepared, laid and sealed is set out on our microcement installation page, and the wider picture for the city is on our page about microcement in Dubai. This guide covers one situation only, the tiled bathroom in a tower apartment, and what decides whether the tiles stay or go.
Bathrooms in tower communities such as Dubai Marina and JLT are usually tiled, and owners refreshing them may want a calmer, seamless look without the noise, dust and waste of hacking every tile off the wall. In a tower, that matters more than in a villa. Lifts, corridors and neighbours all share the disruption, so keeping it small is worth a lot.
Laying over sound tiles avoids much of that. The existing tiles become the base, and the thin coats change the room without the wall being taken back to blockwork. It only works, though, when the tiles are genuinely sound, which is why the survey comes before any price.
We tap every area of tile we plan to cover. A firm tile gives a solid note, while a hollow or drummy tile sounds dull, a sign that the adhesive behind it has let go. We also look for cracked tiles, loose edges around the tray and the basin, movement in the floor, and any staining that suggests water has been getting behind the surface.
If too many tiles are loose, or the floor moves underfoot, covering them would only bring their problems into the new surface. In that case the tiles come off and we build a fresh base, and we tell you so plainly at the survey.
A tiled shower already has tanking behind it, or it should. That waterproof layer is what keeps water out of the wall, not the tile itself, and the same is true of microcement. The sealer makes the finished surface washable and easy to wipe, but the wall behind still relies on sound tanking. If the survey suggests water has been getting past the existing tiles, the shower area is taken back and tanked properly before any finish goes on.
Shower floors need care too. The tray or the falls to the drain stay as they are, and the finish follows them, so a floor that already holds water will still hold water once covered. That is fixed in the base, not in the coats.
Most towers and communities have management rules on working hours and deliveries, so check with yours before dates are fixed. If you rent, ask your landlord first.
Climate matters in a different way indoors. Tower apartments are usually air conditioned, and room conditions can change how coats dry between passes. We talk through the building, the climate and how the room is used at the survey, and plan drying time into the work.
You send photos of the bathroom, a few rough measurements and the address. We look through them, then survey before giving any price, because the tiles and the shower decide the work. Colour and sheen are agreed on a sample board, in one of 48 house colours or any NCS reference, and dates follow once the sample and price are signed off.
The work is planned in blocks of days so the same artisans carry it from preparation through the coats, sealing and handover. How long that takes depends on the room, the repairs and the drying between coats, so we set it at the survey rather than guess.
Not if the preparation is right. The grout lines are filled level and the whole surface is reinforced with mesh before the first coat, so the tile pattern has nothing to telegraph through. Skipping that step is the usual reason old joints appear later.
Often, yes, if they are firmly bonded and the floor does not move. Floor tiles take more load than wall tiles, so we tap them carefully at the survey. Hollow ones are lifted first, and movement joints are carried through the finish.
Most towers and communities have management rules on working hours and deliveries, so check with yours before dates are agreed. If you rent the apartment, ask your landlord first, and keep any written permission ready for the building team.
The sealed surface is washable, but waterproofing comes from the tanking behind it, exactly as with tile. If the existing tanking is in doubt, the shower area is taken back and redone first.
Tell us about your bathroom. Call +44 7592 929191, Monday to Saturday from 9am to 6pm UK time, or email sales@zavore.co.uk with photos, rough measurements and the address of the tower.
For people in Loughborough, Mansfield and nearby East Midlands towns, how our decorative plaster courses in Birmingham and Manchester com...
CareerEvery Zavoré plastering course includes first job support, a lifetime helpline and your finished sample boards, so the step from course t...
BuckinghamshireHow learners from Watford, High Wycombe and Amersham can fit a three day Venetian plastering course at our London centre around work, and...
CoursesOur microcement course runs on 1 to 1 Training for three days, covering substrates, tiles, mesh, primer, thin coats, colour, sealing and ...
Beginner CourseThe theory part of our Beginner Course in plain words, what lime plaster is, how it cures and why it behaves as it does, and how that sha...
Abu DhabiWhy Venetian plaster stays outside the shower in a bathroom, and how UAE applicators learn tadelakt for wet walls on 1 to 1 Training in E...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.