


A villa renovation Dubai families carry out while still living at home can take Venetian plaster one floor at a time, so the house never has to be emptied. Zavoré installs Venetian plaster in every emirate with our own artisans, and on a staged job we finish the ground floor, wax it and hand it back before the scaffolding towers and dust sheets move up a level.
Each floor follows the order set out on our Venetian plaster installation page, and the finishes, districts and building types we cover across the city are on our page for Venetian plastering in Dubai. What changes in a phased renovation is the planning that sits around the coats, so that the colour, the sheen and the protection stay the same from the first room to the last.
Plenty of villas are refreshed with the family still inside. The ground floor usually holds the entrance hall, the formal living room, the dining room and often a majlis, while bedrooms, dressing rooms and a family lounge sit above. Lime plaster goes on in thin coats with drying time between them, and a room cannot be lived in while that happens. Splitting the house by floor means the kitchen and the bedrooms on another level carry on as normal while one part of the house is closed.
It also makes the decisions easier to manage. Rather than choosing finishes for twenty rooms at once, you settle the main finish for the reception floor, see it on the walls, and then confirm whether the upper floor should match it exactly or move to something quieter, such as marmorino in the bedrooms.
Lime dries lighter than it looks wet, and two batches judged by eye rarely agree. That is why a single approved sample matters so much. You choose from our 48 house colours or give us any NCS reference, we make a sample board, and once it is approved it becomes the reference for every phase. The material for the upper floor is tinted to that same board rather than to memory of the lower one.
Sheen needs the same care as colour. The number of polishing passes and the wax used on the ground floor are noted, so the stair wall and the landing above read as one surface. Light changes between floors too. A wall under a skylight on the landing will look brighter than the same colour in a shaded dining room, so we hold the sample up in both places before the second phase begins.
There is no fixed rule, and we talk it through at the survey. Some owners start with the ground floor because guests see it first and a family event is coming. Others prefer to start at the top, so that materials and people do not cross finished rooms on the way upstairs. The stairwell often links two floors with one tall wall, and it is usually treated as its own phase, with access towers set up once and the whole height laid in one sequence so there is no join halfway up.
Rooms here are air conditioned for much of the year, and the way a room is cooled affects how each coat dries. We talk through the building, the climate and how the room is used at the survey, then plan the coats around it.
Most towers and communities have management rules on working hours and deliveries, so check with yours before dates are fixed. Villa communities are no exception, and some limit noisy work or vehicle access at certain times. If you rent, ask your landlord first. Venetian plaster is a dry wall finish and does not belong inside a shower, so if bathrooms are part of the renovation, tadelakt or microcement on a waterproofed wall is the right choice there.
Yes, that is the point of working one floor at a time. The rooms being plastered are closed and protected, and the family uses another floor. Lime is caustic while wet, so children and pets keep away from the working rooms until the wax is on.
It should, because every phase is tinted to the same approved sample board and polished in the same way. We still compare the board against the finished lower walls in daylight and lamplight before the second phase starts, since light differs from floor to floor.
It depends on the wall area, the height, the condition of the base and the finish you choose. Lime needs drying time between coats, so we set the programme at the survey and book it in blocks of days, rather than quoting a figure before anyone has seen the walls.
Yes. Our own artisans install Venetian plaster, marmorino, polished plaster and other finishes in every emirate. The staged approach works the same way in Abu Dhabi, Sharjah or Ras Al Khaimah, starting with photos and a survey.
To plan a phased renovation, ring +44 7592 929191, Monday to Saturday from 9am to 6pm UK time, or email sales@zavore.co.uk with photos of each floor, rough measurements and the villa address. We will go through it floor by floor with you.
How painting companies in Dubai can order Lime Paint for villa repaint work, with colours tinted room by room, labelled tubs and tracked ...
ContractorsHow plastering contractors can add microcement, tadelakt, limewash and Venetian plaster through Zavoré 1 to 1 Training, group courses of ...
Abu DhabiIf you searched for Venetian plaster paint for a villa in the UAE, here is what we actually supply, which real plaster to order instead a...
CoursesWhat three days on the Zavoré tadelakt course involve, from the base and radiused corners to the burnishing window, the stone, the soap a...
CoursesAn honest look at general plastering courses against the Zavoré Beginner Course in Venetian plaster at our Manchester centre, who each su...
Abu DhabiWhere Venetian plaster belongs in an Abu Dhabi villa bathroom, which finish takes over in the wet zone, and how the walls are sealed, sur...
Providing luxury finishes for the most prestigious addresses in the world
Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.
One list, run by the people who make the material. No noise, and nothing we would not want to read ourselves.
We email as the house has something worth saying, never daily. Unsubscribe from any email, or reply STOP to any text. We never pass your details to anyone.