ZAVORÉ
ZAVORÉ
✦
Where Artistry Begins
Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·
Home/The Journal/Microcement Floor for Oxford Kitchen Extensions and Garden Rooms
25 November 2026

Microcement Floor for Oxford Kitchen Extensions and Garden Rooms

A grey concrete effect surface with a mottled texture, the look of a microcement floor in an Oxford kitchen extension

A microcement floor in an Oxford kitchen extension or garden room is a thin, trowelled coating laid by Zavoré over the new screed, giving one surface from the units to the garden doors with no grout and no thresholds. Our own artisans install across the UK. On a new extension the finish is the easy part. What decides the result is a screed that is dry right through, joints that are respected and a floor laid in a single pass.

How the layers go down is explained on our microcement installation page, and our page on microcement in Oxford covers bathrooms, stairs and older floors in the city. This guide is about one job only, the floor of a new rear or side extension.

  • The screed must be dry all the way through, not only on top.
  • Underfloor heating should be discussed at the survey, before any date is set.
  • Movement joints in the slab or screed are carried through the finish, never covered.
  • The whole floor is laid wet in one go, so the room has to be clear and ours for that stage.
  • We survey before we price, and you approve a sample before we book dates.

Why does a microcement floor suit an Oxford extension?

Extensions in Oxford and across Oxfordshire tend to follow a pattern. A Victorian or Edwardian terrace in Jericho, St Clements, Cowley or East Oxford gains a kitchen at the back. A larger villa in Summertown or North Oxford opens its rear rooms to the garden. Houses in Headington and Marston add a rear room with wide glazed doors. In each case the new space is a single open room where cooking, eating and sitting share one floor.

That is the setting where a seamless surface makes sense. There are no tile joints to line up with the units or the doors, the colour runs unbroken to the glass, and the floor can continue into a garden room without a strip at the opening. New extensions also give the finish the base it likes, a rigid slab and screed, which is kinder than the suspended timber floors found in the older part of the same house.

How dry does the screed need to be?

Dry through its full depth. A screed can look and feel dry on the surface while the body of it is still holding water, and that water will try to leave through whatever is laid on top. If a sealed finish goes down too soon, the moisture has nowhere to go.

For that reason we ask about the screed at the survey. What type is it, how thick, when was it poured, and has the building been closed in and ventilated since? Your builder or screed contractor is the right person to confirm when it is ready for a finish, and a moisture reading is better than a guess. We would sooner wait than lay early, and we say so plainly if the floor is not ready.

Can a microcement floor go over underfloor heating?

In general terms, yes, and heated screeds are a familiar feature of new extensions. The points to settle are practical ones. The heating should be installed, tested and run gently by its installer before the finish is laid, so that the screed has already been through a warm and cool cycle. It should be off or low while we work and brought back up gradually afterwards, following the heating installer's guidance. Tell us the system and where the pipes or mats run, and we plan around it at the survey.

What happens at joints, doors and the old house?

Buildings move a little, and a new extension moves differently from the house it is attached to. Where the builder has formed a movement joint in the slab or screed, that joint is carried through the microcement as a neat line, usually placed where a door or a change of room makes it look deliberate. Covering a joint with a rigid coating only moves the crack to somewhere less convenient.

The junction with the original house needs the same thought. If the finish is to run back into an older room with a timber floor, that floor must be stiffened and boarded first, and we will not lay over boards that spring underfoot. Often the cleaner answer is to stop the finish at the line of the old back wall. Door tracks, floor boxes, island plinths and drainage channels should all be fixed before we arrive, because cutting in afterwards leaves a patch.

How is a microcement floor laid in one go?

A wall can be worked panel by panel. A floor cannot, because a join in the middle of the room would show for good. So each coat is taken across the entire floor while it is wet, with enough hands to keep the wet edge alive from one side to the other. We plan the layout, the starting point and the way out of the room before work begins.

For you, this means the room has to be empty and closed to other trades during those stages. Kitchen fitters, electricians and decorators need to be either finished or held back. Units are sometimes fitted first and sometimes after, and we agree that order with you and your builder at the survey. Once the sealer is on, the floor is protected and left to harden before furniture and appliances are moved in.

How does a job in Oxford run from first email to finished floor?

  1. Send photos of the extension, the builder's drawings if you have them, rough measurements and your postcode.
  2. We talk them through with you and then survey the floor, checking the screed, flatness, cracks, joints, access and how the room will be used. No price is given before the survey.
  3. You approve a sample in your colour. Greys, greiges, warm stones and off blacks are the usual choices, from our 48 house colours or any NCS reference.
  4. Dates are fixed once the sample and the price are agreed.
  5. The work is planned in blocks of days, so one set of artisans stays on the job and lays each stage in turn.

How many days the blocks take depends on the area, the base and the drying between coats, which is why it is set at the survey. Our nearest centre to Oxford is the London showroom and training centre, which you can visit by appointment to see finishes at full scale.

Questions about microcement floors in Oxford extensions

Can I have the floor laid before the kitchen goes in?

Sometimes that is the neatest route, because the finish then runs under the plinths. It does mean the fitters must protect the floor carefully. In other rooms it is wiser to lay around fixed units. We look at the layout at the survey and agree the sequence with your builder.

Will a microcement floor crack?

The coating is thin and rigid, so it follows whatever the base does. A sound, dry screed with its movement joints respected gives it what it needs. Where a floor flexes or a joint is buried, cracks follow. That is why we survey first and are frank about what the base needs.

Is it suitable for a kitchen with spills and a garden door?

Yes. The sealer is what makes the surface washable, so everyday spills wipe up. Grit carried in from the garden wears any sealed floor, so a good mat at the doors helps. Clean with a mild cleaner and avoid harsh chemicals and scouring pads.

Can the same finish run through a garden room?

Yes, provided the garden room has a rigid, dry base of its own and any joint between the two structures is carried through. We check both floors at the same survey and match the colour from a single approved sample.

To talk about an extension floor, call 07592 929191 or +44 7592 929191, Monday to Saturday, 9am to 6pm, or email sales@zavore.co.uk with photos, rough measurements and your postcode. A sample board shows you the surface dry before you decide.

Keep reading

More from the Journal

Back to the Journal

Providing luxury finishes for the most prestigious addresses in the world

Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.

PayPal
© 2026 Zavoré Ltd · Est. 2021 · Made to order in Birmingham
For The Trade Three ways to earn with us
Trade accountTen percent off every material in the shop, and a specialist on the phone. Partners & affiliatesGet listed where customers find you, or sell our materials and earn on every order. The Rewards RoomEvery order earns. Samples, tools and an apron, on the house.
Free to join · we reply within 24 hours
EN