ZAVORÉ
ZAVORÉ
✦
Where Artistry Begins
Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·
Home/The Journal/Microcement Dubai, Installing Over Existing Tiles in Tower Bathrooms
24 November 2026

Microcement Dubai, Installing Over Existing Tiles in Tower Bathrooms

A modern bathroom with a seamless finish around the bath and shower, microcement Dubai over existing tiles

Microcement Dubai tower bathrooms can often be finished straight over the existing tiles, as long as those tiles are sound, firmly bonded and properly keyed. Zavoré installs it with our own artisans in apartments across Dubai and every emirate, lifting any hollow tiles, filling and reinforcing the grout lines, and keeping the tanking behind the shower intact before the first thin coat goes on.

How a job is prepared, laid and sealed is set out on our microcement installation page, and the wider picture for the city is on our page about microcement in Dubai. This guide covers one situation only, the tiled bathroom in a tower apartment, and what decides whether the tiles stay or go.

  • Sound, well stuck tiles can usually stay, once cleaned, degreased and keyed
  • Tiles that sound hollow are lifted and the patch made good before work starts
  • Grout lines are filled and the whole surface reinforced so the old pattern never shows through
  • The shower keeps proper tanking behind the finish, and the sealer protects the surface
  • Most towers have management rules on working hours and deliveries, so check yours early

When microcement Dubai tower bathrooms can keep their tiles

Bathrooms in tower communities such as Dubai Marina and JLT are usually tiled, and owners refreshing them may want a calmer, seamless look without the noise, dust and waste of hacking every tile off the wall. In a tower, that matters more than in a villa. Lifts, corridors and neighbours all share the disruption, so keeping it small is worth a lot.

Laying over sound tiles avoids much of that. The existing tiles become the base, and the thin coats change the room without the wall being taken back to blockwork. It only works, though, when the tiles are genuinely sound, which is why the survey comes before any price.

Checking the tiles at the survey

We tap every area of tile we plan to cover. A firm tile gives a solid note, while a hollow or drummy tile sounds dull, a sign that the adhesive behind it has let go. We also look for cracked tiles, loose edges around the tray and the basin, movement in the floor, and any staining that suggests water has been getting behind the surface.

  1. Firm, well stuck tiles are cleaned, degreased and keyed so the primer can grip the glaze
  2. Hollow or cracked tiles are lifted and the gap made good to a flat, solid level
  3. Grout lines are filled so the joint pattern cannot telegraph through the thin finish
  4. Mesh goes over the surface and into corners, junctions and the edges of trays and niches
  5. Movement joints in the structure are carried through the finish rather than covered over

If too many tiles are loose, or the floor moves underfoot, covering them would only bring their problems into the new surface. In that case the tiles come off and we build a fresh base, and we tell you so plainly at the survey.

The shower, the tanking and what the sealer does

A tiled shower already has tanking behind it, or it should. That waterproof layer is what keeps water out of the wall, not the tile itself, and the same is true of microcement. The sealer makes the finished surface washable and easy to wipe, but the wall behind still relies on sound tanking. If the survey suggests water has been getting past the existing tiles, the shower area is taken back and tanked properly before any finish goes on.

Shower floors need care too. The tray or the falls to the drain stay as they are, and the finish follows them, so a floor that already holds water will still hold water once covered. That is fixed in the base, not in the coats.

Tower rules, landlords and the air conditioning

Most towers and communities have management rules on working hours and deliveries, so check with yours before dates are fixed. If you rent, ask your landlord first.

Climate matters in a different way indoors. Tower apartments are usually air conditioned, and room conditions can change how coats dry between passes. We talk through the building, the climate and how the room is used at the survey, and plan drying time into the work.

How a microcement Dubai bathroom job runs

You send photos of the bathroom, a few rough measurements and the address. We look through them, then survey before giving any price, because the tiles and the shower decide the work. Colour and sheen are agreed on a sample board, in one of 48 house colours or any NCS reference, and dates follow once the sample and price are signed off.

The work is planned in blocks of days so the same artisans carry it from preparation through the coats, sealing and handover. How long that takes depends on the room, the repairs and the drying between coats, so we set it at the survey rather than guess.

Questions about microcement over tiles in Dubai towers

Will the grout lines show through the microcement?

Not if the preparation is right. The grout lines are filled level and the whole surface is reinforced with mesh before the first coat, so the tile pattern has nothing to telegraph through. Skipping that step is the usual reason old joints appear later.

Can the bathroom floor tiles be covered too?

Often, yes, if they are firmly bonded and the floor does not move. Floor tiles take more load than wall tiles, so we tap them carefully at the survey. Hollow ones are lifted first, and movement joints are carried through the finish.

Do I need permission from the building?

Most towers and communities have management rules on working hours and deliveries, so check with yours before dates are agreed. If you rent the apartment, ask your landlord first, and keep any written permission ready for the building team.

Is microcement waterproof in the shower?

The sealed surface is washable, but waterproofing comes from the tanking behind it, exactly as with tile. If the existing tanking is in doubt, the shower area is taken back and redone first.

Tell us about your bathroom. Call +44 7592 929191, Monday to Saturday from 9am to 6pm UK time, or email sales@zavore.co.uk with photos, rough measurements and the address of the tower.

Keep reading

More from the Journal

Back to the Journal

Providing luxury finishes for the most prestigious addresses in the world

Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.

PayPal
© 2026 Zavoré Ltd · Est. 2021 · Made to order in Birmingham
For The Trade Three ways to earn with us
Trade accountTen percent off every material in the shop, and a specialist on the phone. Partners & affiliatesGet listed where customers find you, or sell our materials and earn on every order. The Rewards RoomEvery order earns. Samples, tools and an apron, on the house.
Free to join · we reply within 24 hours
EN