Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·Tracked delivery across the UK and worldwide·Same day and 24 hour delivery available·Venetian plaster tinted to your exact colour·Damaged in transit? We’ll replace it within 24 hours or on the same day·Speak to a specialist · 07592 929191·Residential and commercial projects installed by our own team·Trade accounts · 10% and rewards·Training courses at our studio·Showroom · visit by appointment·
Home/The Journal/Venetian Plaster UK Orders for Developers Fitting Out Several Flats
24 November 2026

Venetian Plaster UK Orders for Developers Fitting Out Several Flats

A living room with a leather chair against textured plaster walls, Venetian plaster UK orders for flats

Venetian plaster UK orders for developers fitting out several flats run smoothly from one approved sample, one clear schedule of units and deliveries phased to match the programme. Zavoré tints each order to that sample and sends it on a tracked service across the UK, so a developer with their own decorators can keep every flat in a block, a conversion or a small scheme looking like the same building.

The full range of plasters, primers and waxes is in the Zavoré shop, and the finish itself is explained on our Venetian plaster page. If part of the scheme needs installing rather than supplying, our page on Venetian plastering across the UK shows how our own artisans cover every region.

  • Approve one sample board for the scheme before anything is tinted
  • Send a schedule of units, walls and finishes so we can confirm quantities
  • Tubs are tinted to the approved sample and labelled by unit or floor
  • Orders can be split into phased tracked deliveries that follow the programme
  • Keep leftover tinted material on site for snagging and later repairs

Why developers order Venetian plaster UK wide from one sample

A buyer walking through flat three and then flat nine expects the walls to match. With a hand laid lime finish, that depends far more on the material than on the paperwork. Lime plaster dries lighter than it looks wet, and two tints mixed from a description rather than a physical sample will rarely sit happily side by side.

So the order begins with a sample board, in one of our 48 house colours or any NCS reference you give us. Once the developer or designer approves it in writing, it becomes the standard for the whole scheme. Every later tub is tinted to it, whichever floor it is going to.

Which Venetian plaster suits a block of flats?

For a polished finish, Veneziano Plaster is the usual starting point and comes in Fine, Medio, Grosso and Botticino, so the grain can be chosen to suit the look. Where a developer wants a softer, more even marble look across living rooms and corridors, Calcite and Dolomiti Stucco give the marmorino style. Metallic plasters such as Veneziano Metallico and Stucco Suede Metallico can suit a single feature wall in a show flat or reception.

Behind every finish sits the system. Primer Normal or Primer 4 prepares the wall, and Sealer or a wax such as Bee's Wax Paste protects the surface once it is laid. We help you match the primer and the protection to each wall type on the schedule.

How much Venetian plaster does each unit need?

Quantities come from your drawings, not from guesswork. Measure the walls to be finished in each unit, note which ones are plasterboard and which are masonry, and mark which finish goes where. Polished finishes need more coats than a single textured coat, so each finish is counted separately. Add a margin for losses and snagging, then send the schedule and we confirm the quantities before anything is tinted.

New build walls deserve a note of their own. Plasterboard joints need reinforcing and the right primer, and a polished finish shows every dip, so the walls must be flat before the first coat. It is far cheaper to correct a wall at the board stage than once the plaster is on.

Labelling by unit and phasing tracked deliveries

A scheme rarely finishes every flat at once. Decorators move from floor to floor, and tubs left in the wrong unit can end up on the wrong walls. We label each tub with the unit or floor you name, so the site team can stack them by destination and see what is left at a glance.

  1. Send the schedule of units, the approved sample reference and the delivery address
  2. Agree which units go in each delivery, following your programme
  3. Each delivery is tinted to the same approved sample and labelled by unit
  4. It is packed and sent on a tracked service, so the site can follow it
  5. Tell us about access, loading and set delivery hours on site

We do not promise delivery speeds, so plan each order well ahead of the decorators reaching that floor. Splitting the order this way also keeps tubs out of a site store for longer than they need to be.

Keeping leftover tinted material

Snagging always arrives. A wall is damaged when a kitchen is fitted, a socket moves, or a buyer asks for a small change after handover. Keep sealed tubs of the leftover tinted plaster, labelled with the colour, the finish and the units they came from, somewhere cool, dry and frost free. A repair from the same tint blends far more easily than one made from a fresh order.

Trade accounts for developers and their decorators

Developers and decorators who order across several schemes can open a trade account. It suits repeat buying, where the same palette runs through phase after phase, and the trade page explains how it works.

Questions developers ask about Venetian plaster UK orders

Can every flat in a scheme be tinted to one sample?

Yes. Once the sample board is approved in writing, it is the standard for the whole order. Every tub for every unit is tinted to that sample, whether it goes out in the first delivery or the last, which keeps the finish consistent across the building.

Can you split the order across the build programme?

Yes. Tell us which units go together and we tint, label and send each part on a tracked service. Give us plenty of notice for each part, because we do not promise delivery speeds.

Do our decorators need training first?

It helps if they have not laid Venetian plaster before. The Beginner Course runs in Birmingham, London and Manchester, and a polished wall in a sale flat is not the place to learn. Ask us about the courses if your team is new to lime.

Can you install some units for us?

Yes. Our own artisans install across the UK. Every installation starts with photos and drawings, then a survey before any price, a sample to approve and dates planned in blocks of days.

Send the schedule, drawings and rough measurements to sales@zavore.co.uk, or call +44 7592 929191, Monday to Saturday from 9am to 6pm, and we will confirm the finish, the sample and the quantities for each unit.

Keep reading

More from the Journal

Back to the Journal

Providing luxury finishes for the most prestigious addresses in the world

Venetian plaster, limewash, microcement, tadelakt, metallics, sculptural plaster and gold leaf, supplied and installed by our own team, with Venetian plaster taught at our Birmingham studio.

PayPal
© 2026 Zavoré Ltd · Est. 2021 · Made to order in Birmingham
For The Trade Three ways to earn with us
Trade accountTen percent off every material in the shop, and a specialist on the phone. Partners & affiliatesGet listed where customers find you, or sell our materials and earn on every order. The Rewards RoomEvery order earns. Samples, tools and an apron, on the house.
Free to join · we reply within 24 hours
AR